Sign In | Join Free | My xpandrally.com |
|
Brand Name : Harzone
Place of Origin : China
MOQ : negotiation
Payment Terms : According to detailed order
Delivery Time : negotiation
Packaging Details : According to detailed order
Material : Steel bridge
Feature : Reusable
Capacity : Heavy loading capacity
Structure : Simple
Status : Sefl Fold and Unfold
Iron Fast Bridge / Emergency Bridge / Mechanized Bridge
Iron Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is mainly used to found a bridge with a length of 21m long and a width of 3.3m to guarantee all classes of trucks with a tracked load of up to 60 tons or an axle load of up to 17 tons to go through small medium rivers and dry gaps promptly. It is sort of emergency equipment carried by automobile and does erection and retrieval by erection vehicle.
Specifications for Heavy Mountain Bridge | |
Tracked load / axle load | 55t / 17t |
Outline dimension (L*W*H) | 13*3.3*3.6m |
Gross weight | 32.5t |
Bridge weight | 10.5t |
Bridge length | 21m |
Negotiating length (on hard banks) | 19m |
Section length | 10.63m |
Bridge width (when expanding) | 3.3m |
Track width | 1.15m |
Section height | 0.95m |
End section height | 0.35m |
Operator | 2-3 |
Erection time | 10 min |
Max. longitudinal slope / lateral slope | ±10% / ±5% |
Allowable bank height difference | 5% |
![]() |
Iron 3.3m Width Mechanized Bridge For Emergency Images |