Sign In | Join Free | My xpandrally.com
China CHINA HARZONE INDUSTRY CORP.,LTD. logo
CHINA HARZONE INDUSTRY CORP.,LTD.
CHINA HARZONE INDUSTRY CORP.,LTD. PROVIDE THE CUSTOMERS WITH ASSURANCE AND SUCCESS. TO ESTABLISH THE FIRST BRAND OF EMERGENCY EQUIPMENT IN CHINA
Verified Supplier

13 Years

Home > Mechanized Bridge >

Erection Time 90 Min Complete Bridge Mechanized Fast

CHINA HARZONE INDUSTRY CORP.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Erection Time 90 Min Complete Bridge Mechanized Fast

Brand Name : Harzone

Place of Origin : China

MOQ : negotiation

Payment Terms : According to detailed order

Delivery Time : negotiation

Packaging Details : According to detailed order

Feature : fast erection

Capacity : high loading capacity

Product name : Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge

Condition : New

Warranty : 2 Year

Application : emergency bridges

Span : 17-51m

Standard : AISI GB BS GB/BS

Contact Now

Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge

Description of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge:

Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

The whole set of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge is composed of three parts: bridge span, erection vehicle and transportation vehicle.

Technical parameters of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge​:

No Item Data
1 Load capacity
Tracked load 60T
Wheeled load 13T
2 Life time 10000 times
3 Erection length 17m,25.5m,34m,42.5m,51m
4 Erection width 4m
5 Negotiating depth: ±3m
6 Erection maximum longitudinal gradient 10%
7 Erection maximum transverse gradient 5%
8 Erection time (complete bridge) 90min
9 Retrieval time (complete bridge) 90min
10 Operator(not including driver) 3~4
11 Ambient temperature -41℃~+50℃

Erection Time 90 Min Complete Bridge Mechanized FastErection Time 90 Min Complete Bridge Mechanized Fast

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.

2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.

3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.


Product Tags:

erection time 90 min mechanized bridge

      

mechanized bridge fast

      

mechanized complete bridge

      
Wholesale Erection Time 90 Min Complete Bridge Mechanized Fast from china suppliers

Erection Time 90 Min Complete Bridge Mechanized Fast Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: CHINA HARZONE INDUSTRY CORP.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)